Element 1 Question 1-17C1
C1C17: Equipment Tests
What is the proper procedure for testing a radiotelephone installation?
- A dummy antenna must be used to insure the test will not interfere with ongoing communications.
- Transmit the station’s call sign, followed by the word “test” on the frequency being used for the test. (correct answer)
- Permission for the voice test must be requested and received from the nearest public coast station.
- Short tests must be confined to a single frequency and must never be conducted in port.
Correct answer: B, Transmit the station’s call sign, followed by the word “test” on the frequency being used for the test.
Explanation
Under 47 CFR 80.101, an operator must first listen so as not to interrupt traffic already on the channel. Then the testing station's call sign, followed by the word "test", must be announced on the channel being tested. If anyone answers "wait", the test stops for at least 30 seconds. Saying the call sign and "test" lets other stations know who is transmitting and why.
Why the other answers are wrong
- A, A dummy antenna must be used to insure the test will not interfere with ongoing communications.: A dummy antenna is a good way to avoid radiating, but no rule requires one. When a test has to go on the air, the operator follows the announce-and-listen procedure instead.
- C, Permission for the voice test must be requested and received from the nearest public coast station.: No rule makes you ask a coast station's permission before a voice test. The licensee may run maintenance tests as long as the set procedure is followed.
- D, Short tests must be confined to a single frequency and must never be conducted in port.: Tests must be confined to single-frequency working channels, but nothing bans testing in port. Many installation and repair checks are done alongside the dock.