Amateur Extra Question E1C03
E1C: Automatic and remote control; band-specific regulations; operating in and communicating with foreign countries; spurious emission standards; HF modulation index limit; band-specific rules
How long must an operator wait after filing a notification with the Utilities Technology Council (UTC) before operating on the 2200-meter or 630-meter band?
- Operators must not operate until approval is received
- Operators may operate after 30 days, providing they have not been told that their station is within 1 kilometer of PLC systems using those frequencies (correct answer)
- Operators may not operate until a test signal has been transmitted in coordination with the local power company
- Operations may commence immediately, and may continue unless interference is reported by the UTC
Correct answer: B, Operators may operate after 30 days, providing they have not been told that their station is within 1 kilometer of PLC systems using those frequencies
Explanation
Under Section 97.303(g)(2), you notify the UTC before operating on 2200 m or 630 m. You may begin after a 30-day period unless the UTC tells you your fixed antenna location is within 1 km of a power line carrier (PLC) system using the same or overlapping frequencies. Silence is the green light: no affirmative approval is needed.
Why the other answers are wrong
- A, Operators must not operate until approval is received: No approval is issued; the rule lets you start after 30 days unless the UTC objects that you are within 1 km of a PLC system.
- C, Operators may not operate until a test signal has been transmitted in coordination with the local power company: The rules require no test transmission or coordination with the local power company; the only step is notifying the UTC and waiting 30 days.
- D, Operations may commence immediately, and may continue unless interference is reported by the UTC: Operation may not begin immediately; the rule imposes a 30-day waiting period after notification.
Rule: §97.303(g)