Amateur Extra Question E1C07
E1C: Automatic and remote control; band-specific regulations; operating in and communicating with foreign countries; spurious emission standards; HF modulation index limit; band-specific rules
What notifications must be given before transmitting on the 630- or 2200-meter bands?
- A special endorsement must be requested from the FCC
- An environmental impact statement must be filed with the Department of the Interior
- Operators must inform the FAA of their intent to operate, giving their call sign and distance to the nearest runway
- Operators must inform the Utilities Technology Council (UTC) of their call sign and coordinates of the station (correct answer)
Correct answer: D, Operators must inform the Utilities Technology Council (UTC) of their call sign and coordinates of the station
Explanation
Section 97.303(g)(2) requires operators to notify the Utilities Technology Council (named "Utilities Telecom Council" in the rule) before using 2200 m or 630 m. The notice gives your call sign, the band or bands you intend to use, and the coordinates of your antenna's fixed location. The UTC uses this to check that you are not within 1 km of power line carrier systems on those frequencies.
Why the other answers are wrong
- A, A special endorsement must be requested from the FCC: No FCC endorsement exists for these bands; any General or higher licensee may use them after notifying the UTC.
- B, An environmental impact statement must be filed with the Department of the Interior: No environmental impact statement or Department of the Interior filing is required to operate on 2200 m or 630 m.
- C, Operators must inform the FAA of their intent to operate, giving their call sign and distance to the nearest runway: The FAA is not notified for these bands; FAA notice applies only to certain antenna structures, such as those over 60.96 m (200 ft) or near airports.
Rule: §97.303(g)